Introduction
In a multi-format intramammary line, change parts are the difference between a twenty-minute change and an afternoon of adjustments.A nest stored without identification, a guide exchanged between formats or a worn tool that no one measured produces defects that are attributed to the machine.
This article describes how to identify, store, control and requalify these parts.It is aimed at production and maintenance managers who need the format change to be repeatable and the tooling to be kept in good condition.

*Set of change parts identified by format.*
Which parts make up the set ofchange
The set includes nests, guides, stops, nozzles, capping jaws and, in some cases, insertion station parts.Each one has a different function and wear.
The list must be documented with reference, format to which it belongs and quantity per machine.Without this list, the operator searches blindly.
It is also advisable to include the tools necessary for the change and their location.
Identification
Each piece must have a physical identification: engraving, label or code.The identification must be readable after several cleanings.
The code must be linked to the format reference and the drawing version.A generic code does not allow us to know if the part corresponds.
The identification must also be in the change record, to be able to reconstruct what was mounted.
Storage
Storage must protect the part from impacts, humidity and contamination.A nest resting on an uneven surface can become deformed.
A support or case per piece is recommended, with a visible label and fixed location.Access must be quick, because the changeover time includes searching.
The warehouse must be close to the line and separated from dirty areas.

*Tooling storage with fixed location and labelvisible.*
Useful life and wear
Each piece has a different useful life depending on the material and use.Wear manifests itself as looseness, marks on the part or loss of repeatability.
It is advisable to record the use and measure the wear periodically.Substituting a calendar without measuring can change healthy pieces;replacing only when it fails may be late.
Shelf life must be estimated with data and reviewed.
Requalification
When a part is replaced or modified, the affected format must be verified: first part, dosage and closure.
Requalification may be partial if thechange is minor, but must be justified.
Without requalification, a part change becomes an uncontrolled change.
Table ofmanagement
| Part | Identification | Storage | Lifeuseful | Verification |
|---|---|---|---|---|
| Nest | Engraved code | Hard case | By use and measurement | Set with pieceactual |
| Guide | Label | Vertical Stand | Bywear | Alignment |
| Stop | Code | Compartmented box | By impact | Dimension |
| Nozzle | Code | Soft case | Byobstruction | Jet and dose |
| Gang | Engraved | Rigid case | Bywear | Closing |
Registration and traceability
The change record must include the assembled parts, their code and the operator.It must also include the first part verification.
This record allows a defect to be investigated and detect parts that are used outside their format.
Traceability also serves for maintenance: knowing which part was changed and when.
Change planning with parts
Change planning starts earlierto stop the line.The entire incoming format is collected, identified and checked while the machine continues to produce the current format.In this way, the stop is dedicated to assembly and verification, not to the search for tooling.
The change notice must indicate the source format, the destination format and the parts to be replaced.This provision allows us to verify that the set is complete and that no part has been left in another case or in the wrong location.It also allows maintenance to be notified if any part needs a check before being assembled.
The assembly sequence must be defined in writing: what is disassembled first, what is assembled later and what checks are carried out between stages.A clear order avoids mounting a guide before the nest is established and avoids disassembling the same area twice.The sequence also serves to train those who make the change for the first time.
It is advisable to assign a person responsible for the change and a second person to verify the assembly and the first piece.Upon closing the intervention, the dismantled assembly is cleaned, identified and returned to its location;If it is left on the line table, the next stop begins with the same disorder.
The cost of unidentified tooling
Unidentified tooling does not generate a visible expense on the invoice, but it consumes resources in several points at the same time.The first is time: searching for a part that is not known where it is, or checking if the one that appears corresponds to the format, lengthens the stop and diverts personnel from other tasks.
The second cost is that of duplicate parts.When the code cannot be read, an existing part is purchased or a new one is ordered while the original remains stored without reference.The warehouse grows without control, the inventory is no longer reliable and urgent purchasing becomes the usual way to resolve the shortage.
The third is defects.A similar but not equivalent part can be assembled, appear to have a correct fit and produce rejections that are attributed to the dosage or the material.The investigation consumes quality and maintenance time, and the real origin is hidden because no one relates the defect to the tooling.
To these costs is added the loss of traceability: if it is not known which part was assembled, it is not possible to know if a batch was produced with worn tooling or to limit the scope of a claim.The expense of identifying and storing is limited and planned;The burden of working without this control is spread over many items and is rarely measured.
What parts should be kept in stock
The stock of spare parts is defined by criticality, not by habit.It is interesting to have available the part whose lack stops the line and whose replacement takes longer than the time that can be assumed without producing.A cheap part that is replaced every few changes can be more critical than an expensive one that barely wears out.The lack of that part is not compensated for with tooling of another format, because the adjustment is not equivalent.
It is convenient to classify the tooling into three groups: quick-wear parts, structural parts and specific parts of a single format.The former justify a permanent existence;The latter usually suffice with a reserve unit;the third depends on the frequency with which this format is used and the agreed delivery period.
The minimum quantity must be written and linked to a replenishment manager.When the stock drops below the minimum, replenishment is activated without waiting for the part to fail in production.This threshold is reviewed with the observed consumption and with the actual delivery time, not with the initial forecast.
It is not advisable to accumulate tooling of formats that are no longer produced: it takes up space, complicates the search and ends up mixing with the current tooling.A periodic review of the inventory allows us to remove obsolete items, keep the rest identified and free up locations for the parts that are used.
Wear control in production
Wear is controlled with defined measurement points and a common criterion.Each piece must have indicated what is being measured, with what instrument and in what area, so that two people obtain the same result.The measurement is made with the piece clean and in the same position.Without this agreement, the measurements are not comparable and do not allow a decision.
The frequency of testing can be linked to the number of changes, operating hours or a calendar, depending on how each part degrades.The important thing is that the frequency is decided and recorded, not that it is checked when someone suspects.A check that depends on the criteria of each shift does not serve as a control.
The measured values are noted with date, format and part code.A continuous record shows the trend and allows replacement to be anticipated before defects appear.An isolated value says little;a series tells when the part begins to move outside its usual behavior and how much margin is left.
It is important to distinguish wear from damage.Progressive play is wear;A knock, a mark or a deformation are damages that may require immediate replacement even if the measurement is within the range.The operator who dismantles the part is the one who best detects this difference, as long as he knows what to observe and who to report to.
How requalification is documented
Requalification is documented with the same data as any other verification: what was changed, why, in what format and with what result.The record must allow the intervention to be reconstructed without depending on the memory of the person who performed it or the shift in which it occurred.
The first piece of information is the replaced part: code, location and reason for the change.The second is the verification carried out: first piece, dose, closure and the points that the format requires.The third is the result, with the observed values and the acceptance criteria applied.
The acceptance criteria must be defined before the test.If they fixate after seeing the result, the verification loses value and becomes a confirmation of what has already been decided.It is advisable that they be written down and that the verifying operator knows when to stop and escalate the decision.
The record is kept in the change file and linked to the batch produced next.If the check is not compliant, the line is not released and the part is checked before reassembly.Documentation is no substitute for verification, but without it there is no evidence that the verification was done or what was verified.When the change is repeated, the previous records allow comparing results and detecting whether the new part behaves the same as the replaced one.
What to do if a part does not fit
When a part does not fit, the first rule is not to force it.Hitting, filing or modifying a part to fit it turns an identification problem into a format defect and can damage the seat or the adjacent part, in addition to invalidating the tooling.
The second step is to check the reference.It is advisable to verify the engraved or labeled code, the version of the plan and the format to which the piece belongs.Many mismatches are actually a part from another format or from an older version that was put in the wrong case during a previous change.If the code does not match the one registered for that format, the piece is not assembled even if the appearance is similar.
If the reference is correct, the assembly conditions are checked: cleanliness of the seat, burrs, orientation, presence of product remains and condition of the fixing elements.A correct part may not seat for a reason beyond its control, and replacing it without finding that cause only transfers the problem.
If the mismatch persists, the part is removed, identified as non-compliant and the incident is recorded with the available data: code, format, batch and description of the problem.Production is not released with a part that does not fit.King Pack can review the case and confirm in writing whether the part corresponds to the format.
Operator training in the use of the tooling
Operator training is not limited to assembly.It includes identifying the part, handling it without damaging it, cleaning it, storing it, and recording the change.An operator who assembles well but stores poorly generates the following incident and does not know it.
Training must be practical and done on the line or on a real set of parts.It is advisable that the operator recognizes the code, knows how to locate the part in the warehouse and has made the complete change under supervision before doing it alone.The explanation in the room does not replace supervised execution.
You must also know the acceptance criteria for the first piece and the limit of your performance: what you can adjust and what you should consult.This boundary prevents improvised adaptations and allows the person to know when to stop instead of resolving the imbalance with their own criteria.A person who does not distinguish these limits tends to force the part before consulting.
When a new format is incorporated or a tool is modified, the training is updated and who is enabled for each type of change is recorded.The operator is also the first wear detector: if he knows what to observe, he reports before the defect reaches the product and the stoppage becomes a planned replacement.
Frequent errors
- Parts without identification. The wrong part is assembled.
- Improvised storage. The tooling becomes deformedor it is lost.
- Do not measure wear. It is replaced late or never.
- Do not record the change. It is not possible to reconstruct what was assembled.
- Requalify by eye. The first part is not verified.
- Mix parts offormats. The change produces defects that are difficult to explain.
How King Pack supports
King Pack can provide the list of spare parts with references and drawings, and propose an identification and storage system.The scope includes staff training and the requalification procedure.Capacities and limits are confirmed in writing for each format.
Frequently asked questions
How many change pieces does a line need? Depends on the number of formats and the design.Each format has its set.
How is a part identified? With engraving or resistant label, linked to the format reference and the drawing.
How often is a part replaced? According to its estimated useful life and the measurement of wear.
Can the same part be used for two formats? Only if thedesign allows it and verification confirms it.
What to do if a part is lost? Replace it with a new verified part;do not improvise an adaptation.
Is requalification mandatory after changing a part? Yes, at least the first part verification of the affected format.
Where is the record kept? In the change file and in the maintenance history.
Who approves the requalification after a part change? The persondesignated by production or quality, with criteria defined in writing.The operator can execute the verification, but the release of the format must have an identified person responsible.
Can an exchange part be manufactured in the internal workshop? Only if there is a documented drawing, material and tolerances, and the part is verified against the format before being used.A blank adaptation is not a change part and should not be assembled in production.
Related technical resources
For further specification, please review the intramammary syringe filling line and the specification of a line ofprefilled syringes.These resources help you finalize samples, scope, and acceptance criteria before requesting a proposal.

*Measuring the clearance between nest and part to evaluate wear.*
Conclusion
The partsChanges are managed with list, identification, protected storage, wear control and requalification.Without this system, the change of format depends on luck and defects appear without explanation.