Introduction
Before designing the tooling for an intramammary line, the manufacturer needs five packages of information: plans with dimensions and tolerances, physical samples of each reference, variability data between batches, product data and process and acceptance criteria.If one of them is missing, the design proceeds on assumptions and the cost appears later, in the form of modifications, rejections or a FAT that does not reflect actual production.
This article is a practical delivery list for buyers and technical teams who want to avoid that situation.It does not replace the technical exchange with the supplier, but it allows preparing the conversation with the correct documentation from the first contact.

*Plans, samples and technical sheets prepared for the design of the tooling.*
Why the tooling is designed with dataand not with photos
A photo shows the shape;It does not show the dimension, the tolerance or the rigidity.The tool needs to know how much the body can vary without the nest ceasing to hold it, what force the wall can accept without deforming, and what surface must remain free so as not to damage the cannula.These data cannot be deduced from an image.
Nor is the manufacturer's drawing of the applicator sufficient.In many projects, the applicator is purchased from a third party and the available drawing is a commercial drawing with no process tolerances.In this case, the physical sample and an own measurement are the only reliable basis.
Package 1: drawings with dimensions and tolerances
The drawing must include, at a minimum, total length, external and internal diameter of the body, diameter and length of the cannula, position and dimensions of the flange, geometry of the cap and plunger seat, and wall thickness.Each critical dimension must have its tolerance.
It is also advisable to indicate the material and the manufacturing process, because both explain the expected variability.An injected body and an extruded one can have the same nominal plane and behave differently in the nest.
Package 2: physical samples
Samples must be sent from each reference and, if possible, from two different batches.With them, the rigidity, the finish of the cannula, the presence of burrs and the compatibility with the nozzle are verified.A single sample can hide a variability problem that will appear in production.
Samples must be identified with reference, lot and date.An unlabeled bag forces traceability to be reconstructed and delays design.

*Measuring the diameter of the cannula with caliper before defining the nidus.*
Package 3: tolerances and variability betweenbatches
The tooling must work not with the nominal value, but with the real production range.You must declare what tolerances the applicator supplier guarantees and what variation has been observed between batches.If there are no data, it is advisable to measure a sample of at least three lots before setting the design.
The variability affects the nest, nozzle alignment, and plunger insertion force.A nest adjusted to the nominal can be blocked with the upper batch and released the piece with the lower one.
Package 4: product data
The tooling not only holds the container: it also conditions the filling.Apparent viscosity at the process temperature, shear behavior, solids content and particle size, tendency to foam and sedimentation, and compatibility with the materials in contact must be provided.
If the product is heated or cooled before filling, the temperature range and maximum time in the hopper must be indicated.These data determine the nozzle, the filling profile and the need for agitation.
Package 5: process and acceptance criteria
The design must know the dose and its range, the required tolerance, the verification method, the type of cap and its retention criterion, the planned capacity and the frequency of format change.Without this data, the tooling may be correct for a part and wrong for the process.
The cleaning requirements and the expected documentary scope must also be declared: tooling plans, material certificates if applicable, format change manual and requalification criteria.
How to organize delivery according to the project phase
Not all data arethey need at the same time, and sending them all at once out of order makes reviewing difficult.A useful sequence is this: first the plan and a sample for feasibility;then samples from various batches and product data for design;finally the acceptance criteria and the documentary scope for the proposal and the FAT.
Each phase must be closed with a written confirmation.If the supplier has misunderstood a tolerance in phase 1, the error is carried over to the tooling and appears in phase 3, when correcting it already costs money.
What to do when the applicator does not have a plan
It is a common situation: the applicator is purchased from a third party and there is only one commercial drawing.In that case, the tooling manufacturer can measure the samples and generate a working drawing, but needs the customer to confirm that these dimensions are what their supplier guarantees.
The reasonable procedure is to measure at least ten pieces from two batches, record the values and agree on what tolerance will be used for the design.This work plan does not replace that of the container manufacturer, but it allows progress without blocking the project.
The data package for the FAT
The FAT needs more information than the design.You must bring real product in sufficient quantity, cap and plunger samples, the acceptance criteria and measuring instruments.It is also a good idea to keep a checklist and the recording format to be used.
If the product cannot be shipped for security or transportation reasons, a substitute with similar behavior must be agreed upon and written down.A FAT with water and a real viscous product does not demonstrate the same thing.
What documentation must the supplier return
The exchange is bidirectional.The supplier must deliver approved tooling drawings for manufacturing, parts list, format change instructions, maintenance criteria and the FAT record.It is also advisable that you document the assumptions you have used and the accepted deviations.
This documentation is what allows the line to operate without depending on a person's memory.In an audit, tooling without an approved drawing is difficult to defend.
How to measure a sample correctly
The measurement must be made with a calibrated instrument, at a stable temperature and with a repeatable procedure.For the body, it is advisable to measure the external diameter in two axes, total length and wall thickness in three points.For the cannula, inner diameter and length.
The record must include the date, lot, instrument and operator.Without that data, the measurement does not serve as evidence in a discussion with the packaging supplier.
Errors in measuring samples
The first is to measure a single piece and treat it as representative.The second is to measure without temperature control, when the material contracts or expands.The third is to use a gauge without checking the zero.
The fourth is to confuse the nominal diameter with the average diameter: an oval part can pass the check on one axis and fail on the other.Measuring on two axes avoids this error.
The cost of an incomplete delivery
An incomplete delivery does not usually stop the project: it delays it and makes it more expensive.Tooling is designed with an assumption, manufactured, tested and failed;then the iteration begins.Each iteration consumes engineering time, machining, and sometimes a repeated FAT.
The real cost is not just that of the modified part.It is the delay in start-up, the loss of profits from a stopped line and the loss of confidence in the supplier.That is why the data review at the beginning is the most profitable part of the project.
Minimum delivery template
For small projects, a minimum delivery can be: a dimensioned drawing, three samples of two lots, a product sheet with viscosity and temperature, the dosage range, the type of lid and a capacity table.With this you can start the design and detect the main risks.
For projects with various formats, the template is expanded with a matrix of references, the frequency of change and the planned identification system.
Delivery list in a table
| Document or data | Why is itneeds | Acceptable format | Risk if missing |
|---|---|---|---|
| Body plan | Define dimensions and tooling | PDF or CAD withtolerances | Design based on assumptions |
| Cannula and cap plan | Alignment and closure | PDF or CAD | Nozzle or cappingincompatible |
| Samples of each reference | Verify rigidity and finish | Labeled physical parts | Tooling that does not hold the real part |
| Samples of twobatches | Evaluate variability | Parts labeled by batch | Blocks or loose parts in production |
| Viscosity and solids data | Define nozzle andprofile | Technical data sheet or measurement | Irregular doses and foam |
| Dose range and tolerance | Dimension the dosage | Table ofproduct | Oversized or insufficient system |
| Lid type and retention criteria | Defines the capping | Sample and specification | Closure that fails intransport |
| Capacity and formats | Decide automation | Shift and mixing data | Bottleneck or slow change |
| Requirementscleaning | Design access and disassembly | Procedure or requirement | Difficult cleaning and contamination risks |
How the scope of tooling is agreed in the contract
The contract must list the references covered, the number of nests and pieces per reference, the drawings that are delivered, the format change procedure and the acceptance criteria.It is also advisable to establish what is considered a scope modification and how it is quoted.
This detail avoids two common problems: the tooling that is delivered incomplete because "it was not included", and the modification that is charged as extra because the drawing changed after signing.
How to know if the data is sufficient
A simple test: ask the supplier torepeat the requirement in your own words and point out what is missing.If the supplier cannot describe the applicator or product without asking again, documentation is not sufficient.The technical conversation should be able to move forward without guessing.
Another useful signal is the existence of an assumptions document.A specification that states “slope: flange tolerance” is more professional than one that assumes a value and moves on.
Frequent errors
- Send only one photo. The image is not a substitute for the dimension or tolerance.
- Send a single sample. Lot-to-lot variability is themost common cause of failures.
- Do not declare the temperature of the product. Cold behavior changes the filling.
- Omit the lid retention criterion. Closing becomes a later discussion.
- Do not indicate the mix of formats. The tooling is designed for a single case and production requiresother.
- Do not label samples. Traceability is lost and design is delayed.
How King Pack supports
King Pack reviews documentation and samples before starting tooling design, and flags missing data with its impact on the configuration.The scope may include tooling drawings, filling and capping station definition, FAT criteria, and format change documentation.Capacities and limits are confirmed in writing for each reference.
Frequently asked questions
What is the first thing to send? The drawing with tolerances and a physical sample of each reference.Without these two elements, the design cannot be started with guarantees.
How many samples must be sent? At least one per reference and, if possible, two different lots.For critical parts, three lots allow variability to be estimated.
Is a drawing without tolerances useful? It serves as guidance, but not as a design basis.Samples will have to be measured and tolerances agreed upon before manufacturing the tooling.
Do I have to send product for design? For tool design, viscosity and performance data may be sufficient.For the FAT, the actual product is essential.
How is the confidentiality of the plans protected? With a confidentiality agreement before the exchange.It is a common practice in tooling projects.
What happens if the applicator changes supplier? The tooling must be reviewed and, probably, requalified.A change of supplier is a change of tolerances, even if the drawing is the same.
How valid is a work drawing generated by the supplier? It is used to design and manufacture the tooling, as long as the client confirms the dimensions and tolerances.It does not replace the container manufacturer's drawing, but it allows progress.
How often should the applicator data be reviewed? Every time the supplier, mold or material changes.It is also advisable to review the measurement when a batch with different behavior appears on the line.
Related technical resources
To expand the specification, review the intramammary syringe filling line and the prefilled syringe line specification.These resources help refine samples, scope, and acceptance criteria before requesting a proposal.

*Samples from different lots identified to compare tolerances.*
Conclusion
TheTooling of an intramammary line is designed with five information packages: drawings with tolerances, samples from various batches, product data, process criteria and acceptance criteria.Preparing that delivery before the first technical meeting reduces iterations, avoids assumptions, and makes the FAT confirm the design instead of discovering it.